Why NPV, IRR and payback belong together
Payback is the number most solar quotes use, because it is easy to calculate and easy to understand. It also says nothing about what is left after twenty years. NPV and IRR answer the questions payback cannot, so all three belong in the same page.
Three questions
Payback asks when the investment returns its cost: 5m invested and 600,000 saved a year is 8.3 years. NPV asks how much is left in today's money after twenty years, discounting future cash and subtracting the investment. IRR asks what annual rate the investment earns, the discount rate at which NPV is zero.
| Measure | Question | What it misses |
|---|---|---|
| Payback | When is it repaid? | Everything after repayment |
| NPV | How much in today's money? | Comparing very different sizes |
| IRR | What annual rate? | The scale of the investment |
Option A costs 5m and saves 600,000 a year; option B costs 10m and saves 1.1m. Payback is 8.3 years for A and 9.1 for B, so A looks better. Over twenty years B can have the larger NPV. Payback alone hides the advantage of scale.
Building the twenty years
Take a 400,000 KRW first-year saving, 5m installed, a 1.65m subsidy, 1% maintenance, a 1.5m inverter in year twelve, 3% tariff escalation and a 4.5% discount rate. Net investment is 3.35m, the present value of the flows is about 5.3m and NPV is about 1.95m, with an IRR near 9.8%.
Payback in the same case is about 7.4 years. Positive NPV and an IRR above the 4.5% discount rate make the investment worth considering. If IRR fell to 3%, below the discount rate, NPV would turn negative and the saving assumptions would need rechecking.
How far to trust the numbers
NPV is sensitive: a 10% change in the saving or a one-point change in the discount rate can flip a conclusion. The calculator therefore shows NPV under 0%, 3% and 5% escalation. If all three are positive the conclusion is robust; if only one is, the investment rests on that assumption.
IRR is reliable only when the cash flow changes sign once. A single replacement keeps that property, but repeated extra investment can produce several IRRs. In that case NPV is the measure to use.
The payback trap
Payback ignores the size of the cash flow. A 1m investment saving 200,000 a year for five years and a 10m investment saving 1.5m for twenty have paybacks of five and 6.7 years, so the first looks better, yet the twenty-year totals are 3m and 20m.
The same happens with solar. A 3 kW array may have a shorter payback than a 5 kW, while the 5 kW has the larger twenty-year NPV. Where roof and budget allow, compare the NPV of both rather than stopping at payback.
The limits of IRR
IRR says nothing about scale. A 1m investment returning 30% and a 10m investment returning 20% cannot be ranked by IRR alone; for a household, the absolute amount usually matters more, and NPV captures it.
IRR also multiplies when the cash flow changes sign more than once. A twenty-year flow with repeated replacements can do that, so keep the replacement to one or two events and use NPV when in doubt.
A worked case
With 5m installed, a 1.65m subsidy, 400,000 of annual saving, 3% escalation and a 4.5% discount rate, NPV is about 1.95m and IRR 9.8%. Without the subsidy NPV falls to 300,000 and IRR to 5.1%, which shows how much the grant matters.
At a 300,000 saving NPV turns negative. The response is a smaller array, higher self-consumption or a subsidy. Reading the three measures together shows which lever to pull.
The figures illustrate the method. The real calculation belongs in the 20-year NPV tab with your own inputs.
Questions
Is a short payback always good?
No. It ignores what happens afterwards. A short payback can coexist with a negative twenty-year NPV, and the reverse.
Is a high IRR a good investment?
Above the discount rate it means positive NPV. Small investments tend to show high IRRs, so the absolute amount still needs NPV.
Where does the discount rate come from?
The return you could get elsewhere, or the interest you pay to borrow. Four to five percent is a common planning figure and can be changed.
See NPV, IRR and payback for your own inputs.
Open the calculatorBasis 2026-11-28. Written against primary tables; revised when a rate changes.
Back to the guides