Twelve checks before you sign
Comparing solar quotes on price alone is risky. The same 3 kW can differ in module grade, inverter brand, mounting method and warranty, and missing the subsidy sequence changes the amount. These twelve points should be in the contract, not in a conversation.
Money and subsidy
1. Total project cost, subsidy and own contribution stated separately. 2. Whether the project exceeds the 2026 cap of 4,541,000 KRW for 3 kW, and who pays the excess. 3. Whether a local subsidy exists and who applies for it. 4. A construction date after subsidy approval, because building first forfeits the grant.
5. Extra cost items: scaffolding, structural reinforcement, electrical upgrade, waterproofing repair and the grid connection fee, and whether each is inside the total. 6. Payment schedule and the conditions for the final payment, tied to installation sign-off and grid connection.
Equipment and workmanship
7. Module maker, model, capacity and the low-carbon certificate, which must show 655 kg CO2-eq per kW or less for the subsidy. 8. Inverter brand and warranty length: five years and twelve are very different, and a replacement costs 1–1.5m. 9. Mounting method and waterproofing warranty, naming who is responsible for a leak.
10. Who applies for net metering, installs the netting meter and follows the bill through to the first statement. 11. Construction period and compensation for delay. 12. Cancellation terms and penalties, including the right to cancel if the subsidy is refused.
| Check | What the contract should say |
|---|---|
| Project cost | Subsidy and own share split, cap excess |
| Modules | Model, capacity, low-carbon certificate |
| Inverter | Brand, warranty years, replacement cost |
| Waterproofing | Warranty period and responsible party |
| Connection | Who applies for netting, meter installation |
| Cancellation | Terms if the subsidy is refused |
Verbal promises are weak. 'We will sort the subsidy' or 'we can add a battery later' belongs in writing. Because the subsidy budget can run out, a cancellation clause for a refused grant protects the owner from an unexpected bill.
After installation
Check that the meter and inverter readings agree, that monitoring works, and that netting appears on the first bill. If the pre-netting volume and the post-netting energy charge are not visible, ask KEPCO. The subsidy is paid after installation is confirmed, so keep photographs and the confirmation.
Run the quote through the calculator before signing. If the installer's saving is 20% above the model, ask which yield or self-consumption assumption produced it. An answer that cannot be explained is a reason to wait.
A quote comparison table
Put two or three quotes in one table: project cost, module brand and capacity, inverter brand and warranty, mounting method, waterproofing warranty, whether the installer handles the grid application, and the maintenance period. Price alone hides the differences.
Module count matters even at the same total. Eight 400 W modules and seven 450 W modules are both 3.2 kW, but the larger count adds mounting and wiring cost. Check count and total together.
Defect liability
Workmanship warranties run two to five years, waterproofing five and structures up to ten. A longer warranty is worth having, but only if the company is still trading, so check how long it has operated.
Granted systems are subject to post-installation monitoring by the agency, which may require output and fault reports for a period. Failing to report can trigger repayment, so write the obligation into the contract.
If a dispute arises
Notify the installer in writing first, keeping photographs and quotes. If that fails, the Consumer Agency or the district energy office can advise. A granted system should also be reported to the agency.
Follow any dispute-resolution clause in the contract; mediation is usually faster than litigation. Reading that clause before signing is worth the five minutes.
This list is general guidance and not legal advice. Have a contract reviewed professionally if needed.
Questions
Should I take the cheapest quote?
Price alone can mean lower-grade modules and shorter warranties. Compare total cost, certification, inverter warranty and waterproofing in one table.
When is the subsidy paid?
After installation is confirmed, through the local and agency settlement. It usually takes one to three months, longer if documents are missing.
Can I cancel after signing?
Check the cooling-off period and penalty clauses. A door-to-door sale may carry a statutory right to cancel.
Check the quoted saving against the calculator.